PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Elev. 4-Stair -2 Facing South (800x600).jpg Rebar Mat at Elev. 4-Stair -2 Facing East (800x600).jpg Closing wall forms at L 3.3-5 and M 5-6 Facing North-East (800x600).jpg Excavating at H-5 Footing Facing North (800x600).jpg Excavating at H-5 Footing Facing North -2 (800x600).jpg Building Rebar Mats for Elev. 4-Stair -2 Facing South (800x600).jpg Setting Rebar mats at Elev. 4  2nd floor Facing South (800x600).jpg Starting unbolting the shear wall panels at Elev. 1,2,3 Facing West (800x600).jpg
Previous pageNext page Excavating at H-5 Footing Facing North (800x600)
Excavating at H-5 Footing Facing North (800x600)